Skip to main content
Steps to install your Tjekvik kiosk

Follow the 5 instructions to ensure your kiosks are installed correctly

Jason Dwight avatar
Written by Jason Dwight
Updated over a week ago

Step 1:

Unpack the kiosk(s), and we suggest that this is a "2 people task" since they are heavy.

Step 2:

Place the kiosk(s) where they are intended for use.

If more than one is delivered, they are intended to be placed in an ordring that follow the serial numbers - e.g. kiosk 1 = lowest serial number, and kiosk 2 = the next one etc.

Please be aware that you might discover new things with your customer flow, so your first vision on an ideal position could change once you see the customer behavior (just have this in mind before spending larger amounts on rearranging the LAN and electrical installation needed)

Step 3:

Connect to power (110 or 220 Volt with grounding) and a cabled LAN connection to the internet (the kiosk needs to communicate with the TjeKvik application in the sky, so an open connection is preferable)

Step 4:

Adjust the internal feet (placed under the backend of the foot) to the floor, and consider if the kiosk should be fixed to the floor by using adhesive or similar (butyl tape works well) - If you wish to fix the kiosk to the floor please review this article

Step 5:

Turn on the power and follow the on-screen instructions

Did this answer your question?